How do you really feel in regards to How to Install a Bathtub?
Installing a bath tub isn't exactly brain surgery, but it does need strong plumbing, carpentry, and in some cases, tiling abilities. Replacing an old tub with a brand-new one is additionally a reasonably difficult task. If the old tub is easily accessible, the job can relocate quickly; if you need to open up a wall to eliminate the old bathtub and also position the new tub, the job is a lot harder. In either instance, the task is within a home handyman's skills, although you will need a helper to leave the old bathtub as well as embeded in the brand-new one. Make certain you have actually certified yourself for the task as well as fit trying it. Rather than employing a service provider to take over a halfway-completed project, it is much better to think about using one prior to you start. Opportunities are you might require a specialist plumber to make tube links.
This article will certainly aid you mount a brand-new bath tub in your washroom if you have actually currently purchased a brand-new tub and also do not need to change the setup of your previous water pipelines.
Your tools and also product checklist need to consist of the following:
Removing Old Touches
If you need to change old faucets with new ones as a part of your installation, after that the first thing you need to do is disconnect the supply of water. After doing so, activate the faucets to drain pipes any water continuing to be in the system. The process of eliminating the existing faucets can be quite troublesome as a result of the restricted gain access to that is often the situation.
Utilize a container wrench (crowsfoot spanner) or a faucet tool to undo the nut that links the supply pipelines to the faucets. Have a towel all set for the remaining water that will come from the pipes. When the supply pipes have been eliminated, utilize the exact same tool to loosen the nut that holds the taps onto the bath/basin. You will need to quit the solitary faucets from transforming during this process. Once the taps have actually been gotten rid of, the holes in the bath/basin will need to be cleaned of any kind of old securing compound.
Prior to going on to fit the new faucets, contrast the pipe connections on the old faucets to the new faucets. If the old taps are longer than the new faucets, then a shank adapter is required for the brand-new taps to fit.
Fitting New Touches
If the tails of the brand-new taps are plastic, then you will certainly require a plastic port to avoid damages to the thread. One end of the connector fits on the plastic tail of the tap and also the various other end provides a connection to the existing supply pipelines.
If you require to fit a monobloc, after that you will certainly call for reducing couplers, which connects the 10mm pipe of the monobloc to the conventional 15mm supply pipeline.
Next, position the tap in the installing hole in the bath/basin guaranteeing that the washers are in area in between the tap and the sink. Protect the faucet in position with the supplier given backnut. Once the tap is securely in place, the supply pipes can be connected to the tails of the taps. The taps can either be connected by using corrugated copper piping or with normal tap connectors. The previous kind needs to be linked to the faucet ends first, tightening only by hand. The supply pipes can later on be attached to the various other end. Tighten up both ends with a spanner after both ends have actually been attached.
Mounting the Tub
Making use of the two wood boards under its feet, place the tub in the called for placement. The wooden boards are handy in equally spreading the weight of the bathtub over the location of the boards instead of concentrating all the weight onto 4 small factors.
The next goal is to make certain that the tub is leveled all round. This can be achieved by checking the level as well as readjusting the feet on the bath tub until the level reads level.
To set up taps, fit the bottom of the furthest flexible faucet adapter to the ideal supply pipe by making a compression join; after that do the exact same for the other faucet.
Turn on the water system and examine all joints as well as new pipework for leakages and tighten them if essential. Fill up the bathtub as well as additionally inspect the overflow outlet and the regular electrical outlet for leaks.
Ultimately, deal with the bath paneling as described in the manufacturer's user's manual. Tiling and sealing around the bathtub ought to wait till the tub has actually been made use of a minimum of once as this will certainly settle it into its last position.
Getting ready for the Installation
First of all, the sustaining frame supplied with the bath must be fitted (if called for) according to the maker's guidelines. Next, fit the taps or mixer to the tub. When suitable the faucet block, it is important to make sure that if the tap features a plastic washer, it is fitted in between the bathroom and the faucets. On a plastic bathroom, it is also practical to fit a sustaining plate under the taps system to stop strain on the bathtub.
Fit the versatile faucet adapters to the bottom of the two taps utilizing 2 nuts as well as olives (occasionally provided with the bathtub). Fit the plug-hole outlet by smearing mastic filler round the sink outlet hole, and then pass the outlet through the hole in the bath. Use the nut supplied by the producer to fit the plug-hole. Analyze the plug-hole outlet for an inlet on the side for the overflow pipe.
Next off, fit completion of the versatile overflow pipe to the overflow outlet. After that, screw the pipeline to the overflow face which must be fitted inside the bath. Ensure you use every one of the supplied washers.
Attach the trap to the bottom of the waste outlet on the tub by winding the thread of the waste electrical outlet with silicone mastic or PTFE tape, as well as screw on the catch to the electrical outlet. Attach all-time low of the overflow tube in a similar manner.The bath should now be ready to be suited its last position.
Tiling Around the Bathtub
In the location where the bath meets the floor tile, it is needed to seal the accompanies a silicone rubber caulking. This is necessary as the fitting can relocate enough to fracture a stiff seal, creating the water to permeate the wall surface between the bathroom and the tiling, causing complications with moisture and also possible leaks to the ceiling listed below.
You can choose from a range of coloured sealers to assimilate your fixtures and fittings. They are marketed in tubes and also cartridges, and are capable of sealing spaces as much as a size of 3mm (1/8 inch). If you have a larger void to fill up, you can load it with spins of drenched paper or soft rope. Keep in mind to always fill up the bathtub with water before securing, to enable the movement experienced when the tub remains in use. The sealant can fracture relatively early if you do not take into account this activity before sealing.
Conversely, ceramic coving or quadrant ceramic tiles can be used to border the bath or shower tray. Plastic strips of coving, which are easy to use and also cut to dimension, are also conveniently available on the market. It is recommended to fit the ceramic tiles making use of water-resistant or waterproof adhesive and also cement.
How to Install or Replace a Bathtub
Find Your Dimensions
The first step in any bathtub installation or replacement is to select the right size tub for your bathroom. Start by measuring your existing bathtub’s alcove from wall to wall. The standard size for bathtubs is around 5 feet long and 30 or 32 inches wide. Purchase the size that’s closest to your previous tub.
After you’ve measured, you’ll need to figure out what type of tub you need. Face the alcove. If the drain is on the right-hand side, you’ll need a right drain tub. If it’s on the left, get a left drain tub. Easy enough, right?
Disconnect the Water Supply and Drain Assembly
Before you can start on your removal, make sure that you turn off the tub’s water supply. Some bathrooms have a shutoff valve, but if you don’t see one, you’ll need to turn off the supply at your house’s water main. Once the water’s off, open the valves to release any remaining air in the supply lines.
Then, disconnect the tub drain flange. This process varies based on the type of drain you have, but in most cases, you’ll need a drain flange removal tool to perform this task. If you’re feeling handy, you might be able to use a pair of needle-nose pliers to twist and pull the flange.
Now comes the fun part. In order to disconnect the drain assembly, you’ll need to be able to get to the space underneath the tub. You might need to access the tub drain from a crawlspace or a basement. Don’t forget to take a pipe wrench with you, as you’ll need it to loosen the pipe at the connection.
Cut Out the Old Tub
After removing the drainpipe assembly, you can take out the old bathtub. Cut a strip above the tub edge in the wall surrounding the bathtub that's about 6 inches in height. The tools you need here may vary depending on the type of wall surround you have in the alcove. If you’re cutting drywall, use a drywall saw and remove the section of the wall all the way down to the studs. If you have tile, you’ll need to use a grinder with a diamond blade to cut through the grout line. Then, use a chisel to remove the individual tiles. Take care here not to cut through any studs.
Find the tub flange. Remove the screws that attach the flange to the studs in the wall. At this point, the tub should be freed from the wall.
Once you’ve removed the flange, use a utility knife to cut away the caulk between the tub and the floor. When this is done, you should be able to lift the tub up and out of the alcove. Keep in mind that, depending on what it’s made of, the old tub could be tremendously heavy. You should plan to have a friend help you move it just in case.
Install the New Tub
Before you make any adjustments to the area, place the new tub in the alcove to make sure it fits properly and that the tub drain lines up with the P-trap underneath the floor.
Remove it and install a 2 x 4 ledger board. Measure the tub’s flange, then mark that height on the wall. Screw the ledger board to studs in the wall. This will help to support the weight of the tub.
Once the ledger board has been installed, go ahead and secure the drain to the tub. For this step, you’ll need some plumber’s putty. Roll a small amount of putty in your hands and wrap it around the underside of the drain flange. Push the drain into the tub from underneath the tub.
When the drain has been attached, connect the overflow drain. To do this, you’ll place the gasket on the overflow elbow and move it behind the tub. Once that’s on, connect the overflow pipe and the drainpipe, but take care not to overtighten.
Secure the Tub
After the connections are in, it’s time to set the tub in place. Before you start, make sure the flange lines up with the markings you made in Step 4. Because the ledger board holds the tub in place, it’s important that it matches up. If not, you’ll need to remove it and readjust.
Once your measurements line up, attach the flange to the studs on all three sides of the wall. Please note that you should not screw the flange to the wall. Instead, you should use roofing nails because they won’t rust over time. When the tub is in place, install the baseboard and the molding in front of and around the tub.
Repair and finish off the drywall or tile that you cut in Step 3. If you’re installing a fiberglass bath surround, now’s the time to adhere it to the alcove.
Then, enjoy your tub! While all these steps might seem intimidating, removing and installing a new bathtub is a relatively easy DIY project that can be completed in a single day. And now, when you settle in for your next bubbly soak, you can enjoy your bath without the distraction of a tub in disrepair.
https://www.homeserve.com/en-us/blog/how-to/bathtub-replacement/
As a keen reader on Installing A Bathtub, I figured sharing that article was really helpful. Sharing is nice. You won't know, you may very well be doing someone a favor. Thanks for going through it.
Need pros? Call!